Ecstatic with the final results
Just wanted to send a note of appreciation for the efforts of your team shown during the construction of our new WDS office facility. I can't express enough how ecstatic we are with the final results.
As this was a Design-Build electrical project, your team brought forth the experience we needed in design, budgeting and value engineering. Your superintendent was always gracious to answer our questions and handled all of our changes with a smile. Your project manager and designer kept up with our changes and cost estimates, allowing us to make decisions at a fast pace.
We have have many positive comments, even from the local public, about how beautiful the facility looks at night with the exterior lighting system and flag pole lighting.
Ben Westra
President
Beaver Dam, WI